Roof Repair
The leak is traced to its source and only the failed section is rebuilt, not the whole covering.
Most roof work in this city is on attached houses with low roofs behind a parapet or a cornice. Calls are answered around the clock, and a visit is booked with a local roofer who climbs the roof and reads the attic before any scope is written.
Fastest: call (833) 751-2102. Or send this and we call you back.
Local weather drives activity here: heat, humidity and rain change what shows up week to week.
Baltimore Roofing arranges roof visits across Baltimore for leaks, storm damage, flat roofs and rowhouse edges. Phones are answered around the clock, the call takes the details that shape the visit, and a local roofer reads the roof and the attic before any scope is written.
Baltimore's housing is old and close together. Many of its roofs are low, they meet neighboring roofs at a party wall, and their edges are finished with a parapet or a front cornice. That combination is different from the pitched shingle roofs of the suburbs, and it is why a visit here starts at the edge rather than the middle of the roof.
The city also has a permit rule and a historic review that apply to repairs as well as to replacements. Those are settled on the scope before any material is ordered, so the first conversation covers the house, its age, the roof you think is there and where the water shows.
Pick a service for symptoms, process and typical cost, or call and describe what you hear and see.
The leak is traced to its source and only the failed section is rebuilt, not the whole covering.
Seams, drains and membrane laps are checked, then the failed area is rebuilt so water leaves the roof.
The old covering comes off to the deck, the boards are checked, and a new shingle system is laid over fresh underlayment.
The parapet, the party walls and the flat deck are read first, then the roof is rebuilt in sections.
Tar-and-gravel and modified bitumen systems are read ply by ply, then patched, recoated or rebuilt where they have failed.
Seams are tested, edges are terminated, and failed membrane is patched or re-laid so the sheet holds in wind and rain.
Counter-flashing is set into the mortar, caps overhang both faces of the wall, and the joint is tested before the crew leaves.
The deck, the drainage and the flashing are read first, and the scope is written before any covering comes off.
The whole roof is walked after a storm, damage is photographed and sorted, and the findings are written down.
The water path is traced from the ceiling back to the joint, and the flashing at that joint is rebuilt rather than sealed over.
The masonry is checked first, then the metal is renewed and set into the brick so water runs off the stack.
Sagging runs are re-hung and re-pitched, joints are sealed, and the outlets that serve the roof are cleared and checked.
The old unit is lifted, the curb and flashing are rebuilt to suit the roof, and the new skylight is set and water-tested.
The roof and the attic are checked, and a plain-language report sorts each finding by how soon it needs attention.
A temporary cover is sized, secured and checked over the open area, and removed when the permanent repair is made.
Seasonal checks, drain clearing and post-storm visits are set to the house, and the findings are kept in one record.
The hatch lid, its seal and frame, the access ladder and the railings are checked, and the flashing around each opening is rebuilt.
The parapet, the cornice and the party wall junction are checked before the field, because that is where a rowhouse roof usually fails.
The coverings already down are counted at an edge and in the attic, and the count is written into the scope.
Baltimore City code requires a permit before a structure is repaired or altered, so the scope says who applies and who books the inspections.
Phones are answered around the clock, and the call is used to plan the visit rather than to promise a time of arrival.
After wind, the check follows the edges, the flashing and the openings, and each defect is photographed where it is found.
Each area is photographed before it is closed, and any change to the scope is agreed in writing before the crew carries it out.
Where the mark is, which room, when it appeared and what the weather was doing. Those answers shape the first visit more than anything else.
A local roofer looks at the parapet, the cornice, the party wall and the attic side, and records each finding with a photograph and a location.
The count of coverings, the deck allowance, the edge work, the access plan and the permit are set out in one written scope you can read line by line.
Nothing is ordered or removed until you have read the scope and agreed any allowance for the deck, with photographs kept for the file.
A low roof on an attached house is walled in by its parapet or cornice, so water has few routes off it and tends to find its way through the joints where the roof meets the wall.
The edge is where the roof, the wall and the neighbor's roof come together. Flashing at a parapet, a cap that has lifted and a joint at the party wall all move at different rates, and each is a place where water can get under the covering and into the top floor.
Because the water travels along framing and masonry before it shows, the stain on the ceiling is often in a different room from the failed joint. That is why a visit begins at the edge and the attic rather than at the mark itself.
Wind lifts the coverings at the edges and strips flashing before it does much to the open field, so the check follows the perimeter and the openings first.
The local record includes an EF-1 tornado in November 2018 that tore an apartment roof off in Dundalk, and a May tornado in Dundalk that tore roof coverings from buildings. Both are reasons to check the edges promptly after any strong wind.
A post-storm visit also looks at the skylights, the roof hatches and any rooftop access door, because a seal pushed at one of those openings can admit water with no visible sign on the roof surface.
Baltimore City Code requires a permit before a structure is repaired or altered, and a historic district or a landmark can add a review for the edge and the cornice.
The permit question is settled before the work is ordered. The scope should name who applies for it, who books the inspections and who answers for them if an inspection fails, so the owner is never left guessing whose responsibility the paperwork is.
Where a house sits in a historic district, the front cornice and other character-defining edges may need documented deterioration before any change is made. That record is part of the scope, and it is written before the old edge is opened.
Access is planned before a start date is set. Crews on a narrow block need to know where the material goes, how the roof is reached and how the party wall will be protected.
A rear hatch, a rear addition or a neighbor's roof can be the only way onto some rowhouse roofs. Each route changes the staging, the time it takes to carry material and the number of crew needed on a given day.
Ask for the access plan in writing before the work is booked. An answer that only says access is fine usually means the site has not been looked at closely, and a surprise on the first morning is rarely a small one.
ZIP 21201, 21202, 21217, 21218, 21211, 21213…
ZIP 21204, 21286, 21252
ZIP 21222
ZIP 21228
ZIP 21221, 21261
ZIP 21234
ZIP 21093
ZIP 21208
ZIP 21133
ZIP 21117
ZIP 21237
ZIP 21220
ZIP 21227
ZIP 21207, 21244
ZIP 21136
ZIP 21043
ZIP 21045
ZIP 21060, 21061
ZIP 21128
ZIP 21030
ZIP 21031
ZIP 21162
ZIP 21075
ZIP 21090
ZIP 21219
ZIP 21225
Baltimore, MD · 25 km service radiusCall (833) 751-2102
We also cover many smaller communities across Baltimore City. Check your ZIP.
Tell us when you need someone and we book the earliest visit a roofing technician has, and you approve the price before any work starts.
This page prints no dollar figure, because no verified Baltimore price for roof work was found and a national average is not a city price.
A layer count is a measurement.
Maryland has no separate state roofing license.
Both. Most of the work in this city is on low-slope rowhouse roofs behind a parapet, but pitched shingle roofs on houses in the county side of the metro are also visited and scoped.
Phones are answered around the clock. The call takes the details that plan the visit, and a visit time is confirmed once a roofer has the access and the symptoms in hand.
No figure is given on the first call, because the layers, the deck and the access are found on site. A written scope is what sets the number, and you can compare it line by line.
Baltimore City Code requires a permit before a structure is repaired or altered. Ask who applies for it and who books the inspections, and get the answer into the scope.
A front cornice or other character-defining edge may need documented deterioration before it is changed. The roofer should check the status before anything is removed.
A local roofer does, once conditions are safe. You are told that roofer's name and registration before work is agreed, and the number can be checked before the scope is signed.